Most factory pages say "advanced equipment" and stop there. Here is the count, the capacity, and the public record you can check it against.
Equipment and capacity as registered in the environmental approval for our production-line upgrade project (Cixi Ecological Environment Bureau, 2024). Phase one was completed in September 2025, with RMB 5.12 million actually invested.
Stamping, die-casting and injection moulding all sit under one roof. That means the body of a riveter, its handle grip and its nosepieces are made in the same building — so a change to a mould does not turn into a three-week exchange with a subcontractor.
It also means there is no trading house taking a cut between you and the people who set the tooling. When you ask for a different nosepiece thread, you are talking to the shop that cuts it.
Cixi sits in Ningbo, Zhejiang — on the south side of Hangzhou Bay, between Ningbo and Shanghai. Send us your dates and we will tell you the simplest way in from wherever you land.